References

  1. A. Allahverdi (2016): A survey of scheduling problems with no-wait in process. European Journal of Operational Research 255(3), pp. 665–686, doi:10.1016/j.ejor.2016.05.036. Available at https://www.sciencedirect.com/science/article/abs/pii/S0377221716303733. Note.
  2. P.M. Castro A.M.Aguirre C.A. Mendez (2011): A novel optimization method to automated wet-etch station scheduling in semiconductor manufacturing systems. Computers and Chemical Engineering 28(Number):4, doi:10.1016/S1570-7946(10)28148-8. Available at https://www.sciencedirect.com/science/article/pii/S1570794610281488. Note.
  3. R. Uzsoy C.D. Geiger K.G. Kempf (1997): A Tabu search approach to scheduling an automated wet etch station. Journal of Manufacturing Systems 2(Number):4, doi:10.1016/S0278-6125(97)85674-9. Available at https://www.sciencedirect.com/science/article/pii/S0278612597856749. Note.
  4. N. Leone F. Ricca F. G. Grasso M. Alviano-M. Manna V. Lio S. Liritano (2012): Team-building with answer set programming in the gioia-tauro seaport. Theory and Practice of Logic Programming 12(3), pp. 361–381, doi:10.1017/S147106841100007X. Available at https://arxiv.org/abs/1101.4554. Note.
  5. J.M. Novas G.P. Henning (2010): Reactive scheduling framework based on domain knowledge and constraint programming. Computers and Chemical Engineering 34(12):4, doi:10.1016/j.compchemeng.2010.07.011. Available at https://www.sciencedirect.com/science/article/pii/S0098135410002590. Note.
  6. S. Bhushan I.A. Karimi (2003): An MILP approach to automated wet-etch scheduling. Industrial and Engineering Chemistry Research 42(7):4, doi:10.1021/ie020296c. Available at https://pubs.acs.org/doi/abs/10.1021/ie020296c. Note.
  7. S. Bhushan I.A. Karimi (2004): Heuristic algorithms for scheduling an automated wet-etch station. Computers and Chemical Engineering 28(3):4, doi:10.1016/S0098-1354(03)00192-3. Available at https://www.sciencedirect.com/science/article/pii/S0098135403001923. Note.
  8. C.A. Mendez L.J. Zeballos P.M. Castro (2011): Integrated constraint programming scheduling approach for automated wet-etch stations in semiconductor manufacturing. 20. Industrial and Engineering Chemistry Research 50, pp. 1705–1715, doi:10.1021/ie1016199. Available at https://pubs.acs.org/doi/abs/10.1021/ie1016199. Note.
  9. M. Barry M. Nogueira M. Balduccini M. Gelfond R. Watson (2001): A prolog decision support system for the space shuttle. Proceedings of the 3rd International Symposium on Practical Aspects of Declarative Languages 1990 of LNCS(Number):4, doi:10.1007/3-540-45241-9_12. Available at https://dl.acm.org/citation.cfm?id=667928. Note.
  10. M. Runge M.Gebser P. Obermeier T. Schaub M. Ratsch-Heitmann (2018): Routing Driverless Transport Vehicles in Car Assembly with Answer Set Programming. Theory and Practice of Logic Programming 18(3):4, doi:10.1017/S1471068418000182. Available at https://www.cambridge.org/core/journals/theory-and-practice-of-logic-programming/article/routing-driverless-transport-vehicles-in-car-assembly-with-answer-set-programming/6965B3B4C0D5F5BB0D4BB344582954A4. Note.
  11. M. Gelfond V. Lifschitz (1988): The stable model semantics for logic programming. Fith International Conference on Logic Programming 4. Available at https://www.researchgate.net/publication/2408055_The_Stable_Model_Semantics_For_Logic_Programming.

Comments and questions to: eptcs@eptcs.org
For website issues: webmaster@eptcs.org